The installation of 48m x DN1000 SN2 pipes with prefabricated manifolds and access shafts. The Tank was prefabricated at the Plasco Factory in Dar-es Salaam, and was assembled onsite at Fumba Town , Zanzibar.
As part of the project, the team provides pre-installation training, supervision, and fusion jointing services. Fusion jointing, a method that utilizes heat to seamlessly connect pipes, is commonly used with materials like polyethylene to ensure robust connections in piping systems.
- Location:
- Zanzibar Fumba Town
- Product:
- Weholite Tank
- Year:
- 2021